Section 278 (S278) highway schemes allow developers to carry out works on the public highway to support new developments. These projects are highly regulated and require careful coordination between developers, contractors, and local authorities. Understanding the step-by-step process helps ensure works are completed safely, efficiently, and in full compliance with highway standards.
Step 1: Initial Planning and Design
Every successful Section 278 scheme begins with detailed planning. At this stage, the scope of works is defined, which may include junction improvements, new access roads, traffic calming measures, or pedestrian crossings. Designers must consider traffic flow, safety requirements, and how the proposed changes will integrate with the existing highway network.
Â
Early collaboration between the developer, civil engineers, and the local highways authority is essential to ensure the design meets all required standards before progressing further.
Step 2: Approvals and Agreements
Once the design is prepared, formal approval must be obtained from the relevant local authority. This involves submitting technical drawings, safety audits, and supporting documentation for review. The Section 278 agreement is then finalised, outlining responsibilities, timelines, and compliance requirements for the works.
Delays often occur at this stage if submissions are incomplete or do not meet specifications, so accuracy and experience are crucial.
Step 3: Traffic Management Planning
Before any construction begins, a comprehensive traffic management plan must be developed. This ensures that road users, pedestrians, and site operatives remain safe while works are underway.
Â
Typical measures include:
Â
- Temporary traffic signals or diversions
- Lane closures and signage
- Safe pedestrian access routes
- Phased construction to minimise disruption
Effective planning keeps the project on schedule and maintains public safety throughout the works.
Step 4: Construction and Delivery
With approvals in place, the physical construction phase can begin. This may involve excavation, drainage installation, kerbing, surfacing, and street lighting works. Close coordination between groundworks, drainage, and highways teams is vital to ensure each element is delivered to the required standards.
Regular inspections and quality checks are carried out during this stage to confirm that all works align with the approved design and safety regulations.
Step 5: Inspection and Final Sign-Off
After construction is complete, the works are inspected by the local highways authority. Any defects or outstanding items must be resolved before final approval is granted. Once signed off, the highway improvements can be adopted and opened for public use.
Delivering Successful Section 278 Schemes
Delivering a Section 278 highway scheme requires careful planning, technical expertise, and ongoing communication with all stakeholders. By following a structured process and working with experienced civil engineering contractors, developers can ensure their highway works are completed safely, efficiently, and in full compliance with local authority requirements.